News

Indications for successful results from drilling campaign at Sorik Marapi

Indications for successful results from drilling campaign at Sorik Marapi Drilling rig on site at Sorik Marapi, Indonesia (source: KS Orka)
Alexander Richter 3 Feb 2017

Geothermal developer KS Orka reports positive results from initial tests of first wells drilled for the Sorik Marapi geothermal power project in Indonesia.

International geothermal development company KS Orka reports that it is about to finalise the drilling of its third well for the Sorik Marapi geothermal power project in Indonesia.

Intial tests from well A-101 have been successful and confirm the estimated output of the first well.

We hope to soon report more on the project.

Source: KS Orka via LinkedIn