Think GeoEnergy
Search:
Country:
Region (Continent):
Technology:
Manufacturer:

Select a plant

Africa
Asia
Central America
Europe
North America
Oceania
  • Aluto-Langano
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 7.3
    Running Cap. 16
  • Oserian Binary 306
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 2
    Running Cap. 2
    Geothermal power plant at Lake Naivasha, Kenya. Developed by Oserian Development Company, a local flower producer. The plant was built by Geothermal Development Associates of Reno, Nevada/ U.S. The turbine is an Elliott 4 stage GYR turbine (Jeanete, PA, U.S.) and the generator a Kato Engineering 1,75MW- 3phase.
  • Dieng
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 60
    Running Cap. 0
  • Fang
    Plant Image
    Turbine:
    Technology: Double Flash
    Installed Cap. 0.3
    Running Cap. 25.5
  • Gunung Salak-IPP
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 195
    Running Cap. 0
  • Hachijojima
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 3.3
    Running Cap. 0
  • Kamojang
    Plant Image
    Turbine:
    Technology: Dry Steam
    Installed Cap. 200
    Running Cap. 0
  • Lahendong
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 60
    Running Cap. 2.5
  • Matsukawa
    Plant Image
    Turbine:
    Technology: Dry Steam
    Installed Cap. 23.5
    Running Cap. 7.4
  • Mindanao
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 103.2
    Running Cap. 30
  • Mori
    Plant Image
    Turbine:
    Technology: Double Flash
    Installed Cap. 50
    Running Cap. 11.6
  • Onikobe
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 12.5
    Running Cap. 24.7
  • Sibayak
    Plant Image
    Turbine:
    Technology: Back Pressure
    Installed Cap. 13.2
    Running Cap. 0.2
  • Takigami
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 25
    Running Cap. 65
  • Uenotai
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 28.8
    Running Cap. 0
  • Upper Mahiao Binary
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 5.5
    Running Cap. 0
  • Wayang Windu
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 227
    Running Cap. 1.8
  • Yamagawa
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 30
    Running Cap. 0
  • Yanaizu-Nishiyama
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 65
    Running Cap. 14
  • Yanbaijain South
    Plant Image
    Turbine:
    Technology: Double Flash
    Installed Cap. 9
    Running Cap. 19
  • Yanbajain North
    Plant Image
    Turbine:
    Technology: Double Flash
    Installed Cap. 15.2
    Running Cap. 19
  • Ahuachapan
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 95
    Running Cap. 15
  • Amatitlán
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 24
    Running Cap. 17
  • Berlin
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 109.4
    Running Cap. 16
  • Las Pailas
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 35
    Running Cap. 14
  • Miravalles
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 165.5
    Running Cap. 46
  • Momotombo
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 77.5
    Running Cap. 0
  • Orzunil
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 28
    Running Cap. 114
  • San Jacinto-Tizate
    Plant Image
    Turbine:
    Technology: Back Pressure
    Installed Cap. 46
    Running Cap. 0
  • Altheim
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 1
    Running Cap. 0
  • Bjarnaflag
    Plant Image
    Turbine:
    Technology:
    Installed Cap. 3.2
    Running Cap. 0
  • Blumau
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 0.2
    Running Cap. 0
  • Bruchsal
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 0.5
    Running Cap. 15
  • Dora
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 16.9
    Running Cap. 49.4
  • Germencik
    Plant Image
    Turbine:
    Technology: Double Flash
    Installed Cap. 47.4
    Running Cap. 66
  • Hellisheidi
    Plant Image
    Turbine:
    Technology: Flash
    Installed Cap. 313
    Running Cap. 15
  • Húsavík
    Plant Image
    Turbine:
    Technology:
    Installed Cap. 2
    Running Cap. 1.6
  • Krafla
    Plant Image
    Turbine:
    Technology: Double Flash
    Installed Cap. 60
    Running Cap. 0.7
  • La Bouillante
    Plant Image
    Turbine:
    Technology: Double Flash
    Installed Cap. 14.7
    Running Cap. 15
  • Landau
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 3
    Running Cap. 18
  • Nesjavellir
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 120
    Running Cap. 0
  • Neustadt-Glewe
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 0.2
    Running Cap. 18
  • Reykjanes
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 100
    Running Cap. 100
    Reykjanes has a capacity of 100 MW and started commercial operation in May 2006. Net electrical output to the grid is 96.5 MW. It consists of two Fuji Electric 50 MW double flow condensing units. The inlet steam pressure is 18 bar which is very high for geothermal power plants. The reason for such a high steam pressure is to prevent silica scaling in the turbine and steam system. The salinity of the geothermal brine is similar to seawater. An innovative feature of this plant is that it is seawater cooled.
  • Ribeira Grande
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 15
    Running Cap. 0
  • Simbach Braunau
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 0.2
    Running Cap. 0
  • Soultz-sous-Forêts
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 0
    Running Cap. 15
  • Svartsengi
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 60
    Running Cap. 0
  • Tuzla
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 7.5
    Running Cap. 66
  • Unterhaching
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 3.4
    Running Cap. 19
  • Valle Secolo
    Plant Image
    Turbine:
    Technology: Dry Steam
    Installed Cap. 120
    Running Cap. 0
  • Verkhne-Mutnovskaya
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 12
    Running Cap. 19
  • Beowave
    Plant Image
    Turbine:
    Technology: Double Flash
    Installed Cap. 18.4
    Running Cap. 53
  • Brady Hot Spring
    Plant Image
    Turbine:
    Technology: Double Flash
    Installed Cap. 27
    Running Cap. 0
  • Chena Hot Springs
    Plant Image
    Turbine:
    Technology:
    Installed Cap. 0.73
    Running Cap. 0.5
  • Desert Peak II
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 23
    Running Cap. 0
  • Empire
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 4.8
    Running Cap. 0
  • Heber
    Plant Image
    Turbine:
    Technology: Double Flash
    Installed Cap. 52
    Running Cap. 0
  • Jersey Valley
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 21.6
    Running Cap. 0
  • Lightening Dock
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 0.2
    Running Cap. 0
  • OIT
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 0.3
    Running Cap. 0
  • Puna
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 43
    Running Cap. 0
  • Raft River
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 15.8
    Running Cap. 0
  • Rocky Mountain Oilfield Testing Center
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 0.2
    Running Cap. 0
  • Salt Wells
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 24
    Running Cap. 0
  • Steamboat Hills
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 14.4
    Running Cap. 0
  • Stillwater
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 48
    Running Cap. 0
  • Thermo Hot Spring
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 10
    Running Cap. 0
  • Vulcan
    Plant Image
    Turbine:
    Technology: Double Flash
    Installed Cap. 35
    Running Cap. 0
  • West Ford Flat
    Plant Image
    Turbine:
    Technology: Dry Steam
    Installed Cap. 27
    Running Cap. 43
  • Wineagle
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 0.8
    Running Cap. 56
  • Birdsville
    Plant Image
    Turbine:
    Technology: Binary
    Installed Cap. 0.1
    Running Cap. 0
  • Lihir
    Plant Image
    Turbine:
    Technology: Back Pressure
    Installed Cap. 56
    Running Cap. 6.5
  • Ohaaki
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 103.2
    Running Cap. 0
  • Rotokawa
    Plant Image
    Turbine:
    Technology: Single Flash
    Installed Cap. 35
    Running Cap. 0
  • Wairakei
    Plant Image
    Turbine:
    Technology: Back Pressure
    Installed Cap. 162.2
    Running Cap. 23
  • Wairakei Binary
    Plant Image
    Turbine:
    Technology:
    Installed Cap. 0
    Running Cap. 0.2