News

PannErgy reports successful drilling of new geothermal well in Györ, Hungary

PannErgy reports successful drilling of new geothermal well in Györ, Hungary City center, Györ, Hungary (source: flickr/ Jim Killock, creative commons)
Alexander Richter 26 Sep 2018

Hungarian PannErgy reports the successful drilling of a third well for its geothermal district heating project at Györ, Hungary in time for the upcoming heating season.

Hungarian geothermal company PannErgy Plc reports the successful conclusion of drilling for the BON-PE-03 exploration well to a length of 2,858 meters and a depth of 2,577 meters.

The test results show that the new thermal water well features excellent hydrodynamic properties, and due to its yield the aggregate thermal water extraction capacity of the

The geothermal project of Györ is expected to be as large as 1,100 m3/h, representing more than 20% total capacity expansion in the system. To reach this aggregate yield, the BON-PE-03 production well will operate with pumping, whereas the two other production wells will have self-flowing regimes. During the initial period of the heating season lasting for a few weeks and bringing about moderate weather circumstances, all the three production wells will run in self-producing mode – i.e. more or less without any loss of heat input -, and then the first half of October will see the installation of the well pump into the BON-PE-03 well. Accurate information for the yields can be established during the heating season, in the course of long-term operations. With the additional heat volumes coming from the increased capacities, PannErgy will be able to sell further green energy to existing customers.

In Györ, district heating services (for nearly 24,000 residential units) were launched on 21 September 2017. GYÖR-SZOL Ltd makes heating services available for users -based on the relevant legal regulations and its public utility contracts – in the period from 15 September until 15 May in the following year, by starting and stopping heat supply in the light of the prevailing weather. During this period, heating is provided when the daily mean value of outdoor temperature – in view of the forecasts of the Hungarian

Meteorological Service – is foreseen to remain under +10 °C or +12 °C on three consecutive days, or otherwise the district heat supplier starts heating upon the request of the community of residents with respect to cold weather.

Further up-to-date information in relation to the initiation of district heat supply in Györ can be found at the following link: http://gyorszol.hu/index.asp?x=95&t=t

“We have made strenuous efforts to successfully close the works to deepen and test the BON-PE-03 well still before the beginning of the heating season. In recent weeks, we have been consistently testing the well, and found that with the smaller pipeline resistance owing to the larger well diameter we have been able to meet the yield expectations, though ultimate results can be announced only after the measurements with the pump to be installed early in October. In consequence of the aggregate capacity of the three wells in Györ, PannErgy’s heat-generating capacity will rise, and therefore we will be able to sell more green heat to our partners” – stated Balázs Bokorovics, Chairman of PannErgy Plc’s

Source: Company release